CudaQ
QUANTITATIVE RESEARCH · ACROSS MARKETS

Know. Sooner.

Where data, mathematics and compute converge.

It started with a conversation between a small group of data, financial and infrastructure specialists, and one question: what could you know sooner if the evidence was properly connected?

THE DATA UNIVERSE
~51,000

listed companies across
104 economies.

The answers sit in the connections between them.OBSERVE · CONNECT · TEST

~51,000 listed companies across 104 economies. Countless questions.

Illustrative

Source & scope
01 / THE OPPORTUNITY

Three forces, converging

There is more live and historical data than ever on how markets, companies and technologies interact, and on how a shift in one ripples through others. The challenge has been identifying and quantifying those effects before the market does.

Every model of the future is built on evidence from the past and present. Until recently, how much of that evidence you could put to work depended on how many quants you could hire, how much compute you could access and how long you could afford to wait. There was always more data than could be prepared, and more scenarios than could be tested.

These constraints are lifting. Statistical methods refined over generations. Data at a scale never before accessible. Parallel computing built for exactly this kind of work. Now operating as one system.

Welcome to CudaQ.

FROM DATA TO EVIDENCE
01 / 05THE UNIVERSE

Conceptual animation. Points represent observations, not individual companies.

THE EVIDENCE

More of the world is now measurable

Beyond the headline numbers: insider buying and selling, board changes, customer sentiment, credit-market pricing, and the competitive, policy and supply-chain pressures reshaping a market. Public sources, licensed datasets and APIs bring more of it within reach, across sectors, geographies and decades of history. The value lies in connecting these signals and testing how they move together.

THE MATHEMATICS

Methods that have earned their trust

Bayesian inference, hypothesis testing, econometrics and stochastic simulation have been refined and stress-tested over generations. They turn a thesis into explicit assumptions that can be measured, challenged and updated as evidence arrives. Their reach was long limited by computation. Markov chain Monte Carlo made Bayesian methods practical at scale from the 1990s; parallel computing extends what they can explore today.

Classical methods. Modern architecture.

THE COMPUTE

Calculation at a new scale

The hardware is available to anyone. The advantage is in how it is used. Optimised CUDA libraries and parallel algorithms, designed for each class of analysis, turn GPU compute, high-bandwidth memory and fast interconnects into thousands of calculations running at once. Agentic workflows orchestrate the research around them, and GPU-accelerated quantum simulation through cuQuantum extends the frontier further. Suitable work that once took weeks can be iterated in hours.

02 / WHY IT MATTERS

The value of knowing first

In 1980, Grossman and Stiglitz showed why markets can never be perfectly efficient: if prices already reflected everything, no one would pay to find things out. Research earns its return by revealing what the market has not yet priced.

That return has a half-life. As others discover the same signal, the gap between evidence and price closes. The time it takes to move from raw data to a tested conclusion is therefore not an operational detail. It decides how much of an insight’s value survives.

Informed participants actIllustrative gap remaining 100%
Informed participantsMarket crowdModel-implied value

Informed participants act first. As the signal spreads, consensus forms and the gap closes.

Illustrative

So the question becomes: how do you turn an evidence base of this scale into a tested conclusion, before the market does?

03 / HOW IT WORKS

Three engines, one investigation

CudaQ runs its three engines as a single, converged pipeline. Each thesis sets the configuration: which evidence matters, which methods fit and how much computation the question requires.

01THE ANALYTICAL ENGINE

Mathematical and statistical modelling

Frame the hypothesis, estimate the relationships and quantify the uncertainty. Bayesian and frequentist inference, econometrics and simulation are chosen to fit the question, and their assumptions are tested against what the data actually shows.

Bayesian inferenceFrequentist inferenceEconometricsStochastic modelling
Methods and foundations
Bayes’ theorem & Bayesian inference
Update probability distributions as evidence arrives; examine sensitivity to prior assumptions.
Fisher; Neyman–Pearson inference
Hypothesis tests, confidence intervals, statistical power and error control.
Least squares & panel regression
Estimate conditional relationships across companies and time; examine confounding and model specification.
Box–Jenkins time-series models
Model temporal dependence, trends and seasonality; assess forecast errors.
Markov processes & Monte Carlo simulation
Represent state transitions and propagate uncertainty through possible outcomes.
Graph theory & mathematical optimisation
Map dependencies, identify constraints and evaluate feasible choices.
02THE EVIDENCE ENGINE

Data across sources, sectors and time

Connect company fundamentals and market histories with research, infrastructure, macroeconomic conditions and policy. Value comes from coverage and depth, but also from knowing exactly where each observation came from and when it became available.

Structured recordsDocuments and textHistorical seriesGeospatial observations
03THE COMPUTATIONAL ENGINE

Accelerated computing and modern data science

A GPU runs thousands of calculations at once. Problems that divide into many similar pieces, such as simulation paths, scenario grids, resampling and large matrix operations, can be processed in parallel rather than one step at a time.

Illustrative animation, not a performance benchmark.

Illustrative

Explore the hardware and software foundations

CUDA is NVIDIA’s parallel computing platform and programming model: work is written as kernels that execute across many GPU threads. The CUDA Toolkit provides the compiler, runtime and core libraries; Nsight Systems and Nsight Compute profile performance and are also available as standalone tools. CUDA-X is the wider set of GPU-accelerated libraries and frameworks built on CUDA, including cuBLAS (linear algebra), cuFFT, cuSOLVER, cuRAND (random number generation), RAPIDS cuDF and cuML (data processing and machine learning) and NCCL (multi-GPU communication).

Speed-up depends on the workload. GPUs suit problems with abundant parallel work, such as many independent simulation paths, dense matrix operations or batches of models; small or strictly sequential calculations may run as well on a CPU. Arithmetic intensity, the ratio of operations to bytes moved, indicates whether a kernel is compute- or memory-bound, and batching small problems helps keep the GPU occupied.

Hardware performance depends on both compute throughput and data movement. High-bandwidth memory (HBM) feeds memory-bound work, and host–GPU transfers should be minimised and overlapped with computation. NVLink connects GPUs within a server and, in rack-scale systems, across a rack; InfiniBand or Ethernet with RDMA link systems beyond that, with libraries such as NCCL handling collective communication. Storage and data preparation can become the bottleneck before compute does.

Precision follows the error budget. FP64, FP32 and reduced- or mixed-precision modes, including TF32 Tensor Core maths for supported matrix operations, trade speed against accuracy and need validating for each analysis. Parallel reductions can sum in a different order, which changes rounding; a different random-number stream changes the simulated paths themselves. Fixed seeds alone do not guarantee identical output across hardware or library versions, so results should be checked against a reference within stated tolerances.

In practice, performance depends on the shape of the problem: how much data there is, which algorithms are used, the precision required and how often data has to move. Acceleration should be shown by end-to-end benchmarks against a well-optimised CPU baseline. The skill lies in matching each analysis to the setup that runs it fastest without compromising accuracy.

References: CUDA Programming Guide; CUDA-X; NVLink.

THE PRINCIPLE

A well-framed question gets the most from the pipeline. The evidence decides what holds. Computation widens what can be tested.

Every model makes assumptions and predictions. The data shows whether they hold. If they don’t, the model changes, not the evidence.

04 / THE PIPELINE

From a sea of data to a tested conclusion

Volume alone proves nothing. The work lies in turning millions of observations into a conclusion that can withstand challenge.

OBSERVE · ALIGN · TEST · INTERPRET
Sources & historyPrepare & alignModel & testEvidence & uncertainty
01 / SCALE

Start wide

Tens of thousands of companies, each with hundreds of variables, observed over years. Every source and date adds another dimension to what can be explored.

02 / ORDER

Make it comparable

Resolve company identities, align dates and units, and track gaps, delistings and revisions. Every observation stays linked to its source and the date it became known.

03 / MODEL AND CHALLENGE

Separate signal from noise

Inference, econometrics, network analysis and simulation are selected for the question and the data. Many data points share the same underlying drivers, and relationships shift as conditions change, so candidate findings are tested across periods, adjusted for the number of hypotheses explored and checked on data the model has never seen.

04 / INTERPRET

Make it usable

Findings arrive with their uncertainty, their sensitivity to assumptions and any conflicting evidence, translated into commercial implications.

SEE ONE STEP IN ACTION
THE METHODS IN PRACTICE · BAYESIAN INFERENCE

When new evidence
changes the estimate

A thesis: grid delays could create demand for temporary power. How should evidence from comparable projects change our estimate of delay risk?

Illustrative

STARTING ESTIMATE40%
UPDATED ESTIMATE58.8%

8 of 12 comparable projects experienced a grid delay.

Prior beliefUpdated belief
See the calculation and change the evidence

Let p be the common probability of a grid delay for a defined group of comparable projects. An illustrative Beta(2, 3) prior has mean 2 / (2 + 3) = 40%. For d delayed projects out of n reviewed, the posterior is Beta(2 + d, 3 + n − d).

Updated mean = (2 + 8) / (2 + 3 + 12) = 10 / 17 = 58.8%

Posterior: Beta(10, 7). The updated mean also gives the predictive delay probability for one further comparable project under this model.

Assumptions: a consistent definition of delay, complete outcomes, comparable projects and conditionally independent observations sharing a common delay probability. Shared grid exposure, selection bias or changing conditions require a richer model. Test sensitivity to the prior; repeated reports of one project are not independent evidence.

The arithmetic is simple. The pipeline’s contribution is to identify comparable records, align dates, remove duplicates and repeat the analysis across relevant cohorts. A higher delay probability alone does not establish viable demand for temporary power.

Method: beta–binomial Bayesian updating
05 / TWO HORIZONS

The next catalyst and the next structural shift

The same engines serve two very different questions: what happens when a dated event resolves, and what happens when a slow trend finally becomes visible.

Raw data signalsMarkets, filings & alternative data
Research questionsTheses, catalysts & risks
THE SHARED FRAMEWORKMethods · evidence · computeFrequentist & Bayesian frameworks · connected evidence
TACTICAL · DAYS TO WEEKSEvent-driven scenariosDiscrete catalysts & weighted outcomes
Event studies & simulationAbnormal returns · Bayesian updates · Monte Carlo
Scenario playbooksProbability-weighted outcomes & sector impact
STRATEGIC · QUARTERS TO YEARSStructural trendsEmerging inflections & adoption trajectories
Changepoints & diffusionLead–lag analysis · structural time series
Inflection signalsProjections & explicit uncertainty
Quantified evidenceAssumptions, uncertainty & sensitivity made explicit
One research architecture, two time horizons. Methods and computational scale depend on the question, data and available resources.

Illustrative

TACTICAL · DAYS TO WEEKS

Event-driven scenario modelling

Elections, earnings, rulings and export controls can reprice assets quickly and unevenly. We map each catalyst to defined outcomes, weight them with Bayesian probabilities and estimate their sector-level impact using event study methods, updating as new evidence arrives.

RESEARCH OUTPUTS

Probability-weighted scenario maps, sector dispersion and abnormal return estimates with confidence intervals.

Research discipline

Define the estimation window, event window and expected-return model in advance. Account for overlapping events, confounding news and cross-sectional dependence; use resampling appropriate to the data. Report probability calibration and sensitivity to priors and scenario assumptions. Historical abnormal returns do not establish causality or guarantee future outcomes.

STRATEGIC · QUARTERS TO YEARS

Structural trend analysis

The largest repricings often follow shifts that markets recognise late, such as compute demand flowing into power equipment. Changepoint detection, lead-lag analysis and diffusion modelling identify when a trajectory has genuinely changed.

RESEARCH OUTPUTS

Candidate inflection points, lead indicators and adoption curves with uncertainty bands.

Research discipline

Check stationarity, publication lags and revisions before interpreting lead–lag relationships. Separate exploratory searches from confirmatory tests; assess false discovery rates and performance on held-out periods. Correlation does not imply causation. Adoption curves and changepoints remain sensitive to model specification and regime shifts.

06 / STRATEGY · GAME THEORY

When everyone sees the same signal

Evidence tells you what is true. Game theory helps anticipate what others will do about it. In concentrated markets, every move by an incumbent, a new entrant or a supplier changes the options open to the rest, so the obvious response to a signal is often not the winning one.

The shared signal

Demand strengthens by 20%

All three participants see the same market data at the same time.

01 / The incumbent

02 / The new entrant

03 / The supplier

Market price index

100

Before the signal = 100

See the payoffs: why moving first changes the answer

The incumbent and the entrant each choose whether to expand broadly or hold back and specialise. Each cell shows illustrative profits as (incumbent, entrant).

Entrant expandsEntrant specialises
Incumbent expands 2, −1Price war 5, 2Strategic outcome
Incumbent holds 3, 4Entrant takes share 4, 1Under-supplied

Naive: each player responds to the demand signal as if the others will stand still. Both expand, and both end up in the price-war cell.

Strategic: the incumbent commits first. Once it has expanded, the entrant does better by specialising (2) than by fighting (−1), so the incumbent earns 5 rather than 2. Had the incumbent held back, the entrant would expand and take share (3 for the incumbent). Reading the other player is worth more than reading the demand.

How CudaQ would model this in a real engagement
  • Who the players are: market-share, capacity and order-book data identify the participants whose moves actually change prices.
  • What each player knows: filings, guidance, announcements and procurement records establish what is public, what is private and when it became known.
  • How they respond: capacity-competition and Bayesian game models estimate best responses, calibrated against past capacity cycles in comparable markets.
  • Range of outcomes: GPU-parallel simulation runs thousands of response sequences, producing ranges for capacity, prices and margins rather than a single forecast.

IllustrativeIllustrative strategic scenario with assumed figures and payoffs, not a fitted model, an equilibrium estimate or a prediction.

Read more

The approach at Brentford Premier League Football Club in London illustrates the distinction: statistical analysis, informed by Matthew Benham’s Smartodds background and combined with scouting and judgement, helps assess recruitment value. The useful question extends beyond predicting performance to finding where the price may misrepresent it.

01 / VALUE THE DIFFERENCE

Price the gap,
not the outcome

The question is not simply what will happen. It is whether the market’s implied probability differs from the evidence-based estimate. A likely outcome already priced as likely need not offer an advantage. An underweighted outcome may offer value, after allowing for uncertainty, risk and trading costs. We estimate that gap and the confidence around it; extracting an implied probability from an asset price requires explicit assumptions about payoffs and risk premia.

02 / STRATEGIC INTERACTION

Model the
other players

In common-value auctions with uncertain estimates, winning can indicate that a bidder was unusually optimistic: the winner’s curse. Disciplined bidders account for what winning reveals about others’ information. Related reasoning helps investigate how hyperscalers, incumbents, regulators or rival bidders may respond to a move. Bayesian games and simulation structure plausible strategies, beliefs and responses rather than assuming one fixed reaction.

03 / EXPECTATIONS ABOUT EXPECTATIONS

Second-order
thinking

Keynes’s beauty-contest analogy captures the importance of anticipating others’ expectations, rather than expressing only one’s own valuation. A research thesis can therefore examine how consensus might shift, and when. Statistical evidence combined with explicit assumptions about participant behaviour can reveal plausible routes for that shift, together with the conditions that would invalidate them.

04 / COMPUTATIONAL SCALE

Where parallel
compute matters

Strategic models branch quickly as competitor responses create further scenarios. GPU-parallel simulation can expand the set of strategic paths examined and stress-test a thesis against plausible reactions. More paths do not make a model correct: results remain conditional on the strategies, payoffs, information and behavioural assumptions included.

FOUNDATIONS & CONTEXTGrossman & Stiglitz (1980) · Informational efficiencyMatthew Benham · Data, recruitment & judgement

Further foundations: Keynes, The General Theory (1936), chapter 12; common-value auction theory and Bayesian games.

07 / THE FRONTIER

Where computation goes next

Quantum computing offers new approaches to selected optimisation, simulation and sampling problems. Our research explores hybrid workflows in which classical data preparation feeds quantum routines, running on GPU-accelerated simulators today and on quantum processors as they mature.

The discipline does not change. Each quantum method is benchmarked against the strongest classical alternative, accounting for data encoding, noise, runtime and cost. Practical advantage is something to be demonstrated, not assumed.

Illustrative

Methods, evidence and compute are the means. The question is what they reveal when pointed at real markets.

08 / APPLICATIONS

Opportunity lives at the intersections

The most valuable questions rarely sit inside one sector. They sit where technologies, constraints and markets meet, where a change in one quietly creates demand in another.

Ripple effects · Global trade
A major shipping route is disrupted
1st order2nd order3rd order
Areas affected 0
Conceptual illustration, not measured relationships.
Ripple effects · AI infrastructure
AI compute demand steps up
1st order2nd order3rd order
Areas affected 0
Conceptual illustration, not measured relationships.
01 / OBSERVE THE VARIABLES
Campus demandGrid-connection timingGas supply capacityEquipment lead timesCost of delayed capacityGeneration economicsLoad variabilityPermits & emissionsRedundancy needsFuel-price exposureService capacityPower-system integration
02 / CONNECT & TEST
ConvergenceMethods
Evidence
Compute
03 / INVESTIGATE THE OPPORTUNITY

Bring your own power
for data centres

Could grid delays and time-sensitive campus demand create a durable market for on-site generation, from gas turbines and engines to solid oxide fuel cells?

THE EVIDENCE TEST

Time to power · Delivered energy cost · Firm capacity

Illustrative

What else could explain it?

A finding has to survive its alternatives

Grid delays appear to drive on-site power plans and supplier orders. Before that becomes evidence, every competing explanation is tested. Select one, or run them all, and watch how much of the relationship survives.

Grid delays On-site plans Supplier orders
Grid delays
On-site plans
Supplier orders
Relationship remaining after tests100%

Share of the raw association left once each alternative is accounted for. Dashed line: below this, it is not treated as evidence.

Candidate connection Alternative to test Tested and accounted for

The question that remains

Where might grid constraints create sustained demand for on-site power equipment, and what evidence would overturn that thesis?

IllustrativeConceptual illustration with assumed effect sizes, not measured data, an estimated correlation or a forecast. Correlation does not establish causation.

This is the same Bayesian logic shown earlier, scaled across every comparable project, region and supplier at once. One thesis, tested from every direction it can be challenged.

Technology & supplier context

Compare gas turbines and engines with SOFC systems, which convert fuel electrochemically without combustion. Natural-gas-fuelled SOFCs still emit CO₂. Evaluate fuel delivery, permitting, equipment availability and the full reliability architecture; bringing your own power does not remove those constraints.

Demand may extend to switchgear, power conversion, controls and maintenance. Supplier examples: GE Vernova’s data-centre gas power and Bloom Energy’s SOFC platform. These illustrate available technologies, not a preferred supplier or a proven investment thesis.

ANY MARKET · ANY THESIS

Every market leaves evidence

Filings, orders, prices, people, policy. Most of it is never connected, and most of what is connected is never tested. CudaQ connects it, challenges it and shows you what holds, before the market does.

Know. Sooner.

PROJECT ENQUIRIES · BY REVIEW

Bring a thesis. Put it to the test.

Engagements are selective. We keep a focused portfolio to preserve the depth our methods demand: quality over quantity. If we’re not the right fit for your question, we’ll let you know.

0 / 4,000